ENVIRONMENTAL CONSULTING SERVICES PROVIDED TO FORTUNE 100 CLIENT
DE, FL, ME, MD, NJ, OH, and TX
------------------------------------------------------------------------------------------------------
Duffield Associates provided approximately $10 million worth of
broad-based environmental consulting services to a financial corporation
over a 10 year period. This client's typical approach was to restore
economic vitality into developed urban centers, which yielded a
challenging array of environmental issues for Duffield Associates.
Our services provided have included:
- Phase I and Phase II Environmental Site Assessments,
- Ecological assessments,
- Underground storage tank removals and assessments,
- Hydrogeological assessments,
- Brownfield programs applications and regulatory agency liaison,
- Asbestos surveys,
- Asbestos abatement design,
- Geotechnical investigation, analysis and design,
- PCB clean-ups,
- Hazardous substance remedial design, and
- Construction management for hazardous substances, asbestos and
lead paint related issues.
Projects for this client have occurred in Delaware, Florida, Maine,
Maryland, New Jersey, Ohio, and Texas, often with extreme deadlines.
Some of these projects were generally above average in size and
complexity, such as identifying asbestos-containing materials in
600,000 sq. ft of building space and developing abatement specifications
in less than 10 days, then managing the abatement of the 7 miles
of pipe insulation and 9 acres of floor tile to completion in less
than two months from project inception. Duffield Associates also
assessed outdoor soil and groundwater conditions on this 160-acre
site and developed plans for tank, transformer and soil removals
while the asbestos work was in progress. In another instance, demolition
of an abandoned and crumbling manufacturing complex in Maine required
identification of lead-based paint, asbestos-containing materials,
hazardous wastes, underground storage tanks, impacted soils and
PCB-containing items, followed by removal specifications, removal
management and brownfields approval, within the time space of one
and a half months in the middle of winter.
Duffield Associates was able to meet our clients' needs in each
instance, typically within the context of other construction work,
eliminating down-time and scheduling conflicts.
|
|