U.S. ARMY CORPS OF ENGINEERS - PHILADELPHIA DISTRICT
INDEFINITE DELIVERY CONTRACT FOR GEOTECHNICAL, GEO-ENVIRONMENTAL
AND HAZARDOUS/TOXIC SERVICES
------------------------------------------------------------------------------------------------------
Duffield Associates was retained by the U. S. Army Corps of Engineers,
Philadelphia District for two consecutive open ended engineering
services contracts. Emphasis was placed on geotechnical, coastal
structure and environmental engineering, which includes projects
of varying scope including:
Vibrocores, Bathymetric Survey, and Geo-acoustic Survey -
performed extensive vibrocoring off the Atlantic Coasts of New Jersey
and Delaware to obtain off-shore sediment samples from potential
beach replenishment borrow sources as well as maintenance soils
from active shipping lanes.
Instrumentation Installation and Monitoring for a New Cross Dike
at Wilmington Harbor South - performed geotechnical design for
state of the art geotechnical instrumentation to monitor the performance
of geogrid reinforcement placed at the foundation of a new cross
dike at the Wilmington Harbor South Confined Dredge Disposal Facility.
Bethany Beach and South Bethany Beach Fill and Dune Construction
- designed an approximately 2 million cubic yard beach fill construction
template and prepared bid documents and compilation of data. This
assessment included collection and analytic testing of sediment
samples. Samples were analyzed for organic and inorganic substances,
including PCB congeners, dioxins and furans to part per quadrillion
levels
Hazardous, Toxic and Radioactive Waste Assessment for Wilmington
Harbor - identified potential substances of concern that might
be present in the water column or sediments and potential sources
of these substances utilizing vast internal and external data bases
to facilitate a complete, cost effective and timely geo-environmental
report.
F.E. Walter Dam - performed a geotechnical/hydrologic evaluation
and design to replace a weir. Also performed a subsurface evaluation
to determine foundation conditions beneath the right abutment of
this 3,000-foot long earth dam.
Dredged Material Neutralization Study, Courthouse Point, MD
-analyzed samples of dredged materials from the Courthouse Point
Containment Area as well as future dredge material from the C&D
Canal and provided recommendations for its neutralization.
Pearce Creek - completed a feasibility study of the long-term
utilization of this dredged material containment area for 20-years
and 50-years of capacity.
Drilling and Lab Testing Program, Design of Replacement Jetty,
Cofferdam, Christina River - performed the subsurface investigation
and geotechnical testing of soil samples from the Wilmington Harbor,
Cellular Sheetpile South Jetty.
Drilling and Testing Program, C & D Canal Project Office,
Bulkhead Replacement - performed geotechnical investigation,
laboratory testing and analysis for a subsurface investigation along
the existing Chesapeake City bulkhead adjacent to the Philadelphia
District's Chesapeake City Project Office.
Design Of Protective Breakwaters For The U.S Coast Guard Station,
Cape May, NJ - assisted in the evaluation of the design and
feasibility of a breakwater. Engineering services provided included
a review of currents, mooring configurations, observed storm conditions
within the harbor, and a proposed breakwater design proposed by
the USCG.
Molly Anns Brook/Herman's Garage - failure of an existing
building's foundation wall was observed as part of the USACE stabilization
of Molly Anns Brook flood control project. Duffield Associates responded
quickly to evaluate the stability of the structure and provided
remedial recommendations for its stabilization.
Project PDF
|