SITE EVALUATION FOR REDEVELOPMENT AS PHILADELPHIA EAGLES'
CORPORATE HEADQUARTERS AND TRAINING FACILITY
------------------------------------------------------------------------------------------------------
Challenge
An evaluation needed to be done quickly, but was complicated by
the need to negotiate an access agreement with the U.S. Navy. The
site contained aboveground and underground tanks, potential environmentally
impacted soils, buried debris, and asbestos-containing building
materials. Available information had to be assimilated quickly and
considered in final solution to reduce construction costs and tenant
liability.
Solution
Duffield's engineers and scientists quickly accomplished a combined
environmental and geotechnical evaluation in accordance with U.S.
Navy Protocols, within tight budgetary constraints and an aggressive
schedule.
The team produced a low-cost, managed risk approach to address
regulatory agency requirements. As part of this effort, we advised
our clients in negotiations with the U.S. Navy regarding site acquisition
issues. Duffield Associates' geotechnical engineers developed cost
sensitive recommendations for multiple alternative foundations to
support the training facilities and multiple state-of-the-art indoor
and outdoor practice fields.
Environmental characterizations were conducted by Duffield Associates
on behalf of PIDC and the Philadelphia Eagles. The site was enrolled
in the Land Recycling Program (Act 2) to address environmental conditions
during site development, to perform remedial actions, and to seek
a relief of liability under Act 2. Duffield Associates assessed
existing information about the property by summarizing historic
maps, site plans, and aerial photographs, reports completed by other
environmental consultants, and regulatory agency files. We also
completed soil and groundwater evaluations through the installation
of groundwater monitoring wells, soil borings, and test pits. Using
Act 2 procedures, including a Notice of Intent to Remediate (NIR),
Duffield Associates developed a Soil Remedial Investigation Report
(with Ecological Screening), a Soil Risk Assessment Report, a Groundwater
Sampling and Analysis Plan, and a Final Report for Soil and Groundwater.
The results indicate that no further action is necessary.
Athletic Fields Consultation
Duffield Associates assisted in evaluating various playing surfaces
available for use on three outdoor and one indoor playing field.
Considerations included user comfort/safety, durability, cost and
compatibility with the formerly existing playing surface in Veteran's
Stadium and also their new stadium that had not yet been constructed.
Ultimately, natural grass playing surfaces were selected for two
of the outdoor fields. A proprietary sectional composite synthetic/natural
grass system was selected for the other exterior system and a synthetic
system was selected for the indoor playing field. Duffield Associates
worked with the manufacturer to develop specifications for the subgrade
materials and preparation. We provided quality assurance review
during the fields' construction. Subgrade preparation was complicated
by the previous site development, which required the contractor
to address abandoned tanks, utilities, existing pavements and small
structures. A balanced solution consisting of a geosynthetic reinforced
stabilization layer, which redundantly addressed field support,
drainage and irrigation concerns against the high expense of fully
removing undesirable subgrade soils was successfully implemented.