ASTRAZENECA OFFICE AND LABORATORY CAMPUS
WILMINGTON, DE
------------------------------------------------------------------------------------------------------
Duffield Associates completed environmental and geotechnical studies
in support of subsequent design, remediation and construction phases
of the 80+ acre main campus including six office buildings, the
parking garage and substantial paving.
Duffield Associates also provided creative stormwater management
solutions which enabled temporary structures to be easily converted
to permanent structures with limited conversion costs. The stormwater
design minimized overall land coverage, maximized aesthetics while
being sensitive to costs. The solution for stormwater management
enhanced environmental site conditions through replenishment of
wetlands with stormwater from clean roof sources and restored a
graded stream bed. These improvements were well received by citizen
groups, which help maintain support for the project.
Structural engineering services included the design of a private
vehicular bridge to connect the north and south campuses of this
pharmaceutical company's new office and laboratory campus.
During the construction phase, Duffield Associates provide a wide
range of full-service testing and review, staffing the project with
up to 4 individuals at any given time. Construction services provided
by Duffield Associates included:
- foundation subgrade review
- soil compaction
- concrete testing
- sprayed on fire proofing
- pavement
- masonry
- floor flatness
- MSE wall
- structural steel review including ultrasonic testing of full
penetration welds